Hayes Village

Nestles Avenue, Hayes, HAYES, Middlesex, UB3 4QA

Get Updates

Sign up now to stay up to date with new releases and special offers on this development and others close by from our brands Barratt Homes, David Wilson Homes and Barratt London. You can unsubscribe at any time - please see our privacy policy for more.

How will Barratt London use my data?

We'll only ever contact you in ways you've agreed to, keep your data safe, and will never sell it on to a 3rd party.

To find out more about what we do - and don't do - with your data, read our privacy policy.

Thank you

We will be in touch with updates on this development and others close by based on the contact details you have shared with us.

Over the next 7 years, Barratt London will be building over 1,300 homes on the site of the former Nestle Factory in Hayes, an area undergoing significant regeneration. The development will include a new public park and lots of green open spaces and play areas. A previously inaccessible part of the canal will be opened up for the public to enjoy and there will be plenty of commercial space.

  • Under 10 mins to Hayes & Harlington Station
  • Reach Bond Street in 20 minutes
  • New canal-side realm
  • Cycle storage & car parking available
  • Expansive park & communal gardens
  • Move in from summer 2020
Images include optional upgrades at additional cost

Events and offers

Event

The development will launch in spring 2019 when one, two and three-bedroom apartments will be available to buy for a mid-2020 move.

Site and location

Site plan
Local area map

About the area

A fantastic location

Crossrail will serve Hayes & Harlington Station from December 2019, offering the residents of Hayes Village excellent transport links into Central London and further afield. You will be able to reach Heathrow Airport in 5 minutes, Bond Street in 20 minutes and the City in 27 minutes.

Essentials on your doorstep

The development will include a new public park and lots of green open spaces and play areas. A previously inaccessible part of the canal will be landscaped and opened up for the public to enjoy. There will also be a large amount of commercial space, with a café and shop expected to occupy the retail units.  

Efficient, modern design

The first phase of the development will provide 284 one, two and three-bedroom homes, which will be ready to move into from summer 2019.

Disclaimers

Please note that all images are for illustrative purposes only. Images include optional upgrades at additional cost. Please see our Image Disclaimer for further details.

Super fast broadband is available on selected plots only. Broadband speeds may vary, which may be affected by various factors including distance from the exchange, time of day and internal home wiring. Actual installation time will be dependent on the broadband provider.

Square footage is the total internal floor area of the home, measured from the internal face of blockwork, excluding the garage (if applicable) and any area with less than 1.5m clear headroom under sloping ceilings. The area taken by stairs is included in both floors that the flight serves.

Gross annual projected rental yield figures are based on the projected yields of at least two independent valuations supplied. Figures do not represent guaranteed rental return and are based on the property being continually rented.

'5 Star Housebuilder' awarded to Barratt Developments Plc Group brands